Case study · Border operations · £40m · Solution design
Continuous improvement design for HMRC border facilities
Our Solutions Director led the solution design for a UK public services provider bidding to run HMRC’s £40m inland border facilities contract, at sites where heavy goods vehicles are checked and goods inspected away from the port.
The challenge
HMRC re-procured the operation of its inland border facilities and asked bidders to show how continuous improvement would cut the cost of running them year on year without weakening the service. HMRC’s own data showed traffic around 50% below what had first been expected. At Sevington, the largest site, 660 staff ran the operation, and any reduction had to follow the transfer of those staff to the new provider.
What our Solutions Director did
Our Solutions Director led the design from the enterprise operating model to a costed programme of improvements. The work covered:
- An enterprise operating model in three layers: site-based operations from arrival and park-up to inspection and departure, the site supporting services, and the back office, with each role marked as from HMRC’s model or added by the solution design
- Simulation-led capacity planning: a model of vehicle volumes by day and night that set the lanes and sheds needed, at most 12 lanes and two inspection sheds with a third for surges, then fed a workforce model, the cost model and the project timeline
- Each improvement designed as a micro-solution: self-service kiosks that allocated drivers a parking space while their vehicle was searched, signage and road markings, lane traffic lights, a security review that replaced fixed guarding with patrols and CCTV, and demand-based inspection with multi-skilled staff. Each carried its staffing effect, training, project plan and risks.
- A target operating model for Sevington: from 660 staff to 307 without new technology, or 237 with it, and from 112 to 89 at Holyhead, with every change going live together so transferring staff went through a single consultation
- A continuous improvement method for the life of the contract: five Lean Six Sigma stages (identify, scope, governance, deliver and assess), a monthly improvement register shared with HMRC in real time, and quarterly proposals with gain share, each taken through change control
- Social value delivered locally: apprenticeships and local jobs, a supply chain programme with prompt payment, an innovation fund with a local college and school, and a Green Ambassador environmental programme
Services: Solution & Service Design · Business Development & Strategy
Next step
Talk to us about solution design for a complex, multi-partner bid
Send us the opportunity and the deadline. We will tell you straight whether we can help, what it takes and what it costs.